Sport Psychology

Menu
Menu

Architect approval received for Mizzou’s Memorial stadium – South expansion project

Posted on February 27, 2023 by qpsx

The university of Missouri (MU) department of Intercollegiate Athletics has received its ninth, seven-figure gift toward the new south end zone facility at Memorial Stadium/Faurot Field, which is scheduled to open ahead of the 2019 football season. An anonymous donor made a US$2m gift toward the project, which is currently being designed by the Kansas City-based architecture firm Camiseta Palmeiras Populous, last Friday.

 

Mizzou director of Athletics, Jim Sterk, said:

With the Board of Curators approving populous as the facility’s architect and the continued generosity of our donors, there continues to be tremendous momentum for this facility which is so important to the long-term future of Mizzou Athletics, and in particular our football program. We are so grateful for the donors who continue to come forward with transformational gifts to help make this a reality for our student-athletes, staff and fans.

 

This gift marks the project’s ninth, seven-figure gift in the past eight months, which is a fiscal year record for Mizzou Athletics (the previous high was six such gifts). To date, more than US$46m has been secured in private donations for the new facility.

 

Mizzou Head Football Coach, Barry Odom, said:

We’re really excited to continue the momentum from our donors, and coming on the heels of the Board’s action last week, this is great news. We are very grateful to the Board of Curators for their support of this project, and I’m looking forward to working with the populous team as we design a facility that will be one of the best in the country.

 

Populous was approved last Thursday by the university of Missouri Board of Curators as the architect for the US$96.7m project, which is scheduled to be completed by 2019. Recognised as one of the nation’s premier sports architect firms, Kansas City-based populous has completed major football projects since 2012 for Texas A&M, Oklahoma, Kansas state and Colorado, while designing the three newest on-campus FBS stadiums in Minnesota’s TCF bank Stadium, Baylor’s McLane stadium and Colorado State’s Sonny Lubick Field, which debuts in 2017.

 

The Mizzou project will include a four-storey football team facility in the south end zone at Memorial Stadium/Farout field as well as new premium seating opportunities for Tiger football fans.

 

In addition to providing a new state-of-the-art home for Mizzou Football and creating new revenue streams for Mizzou Athletics through premium seating opportunities, the new facility will also have an impact on the central Missouri economy, as a recent study conducted by Plano, Texas-based Convention, sports and leisure projects a US$700m regional impact from the project along with 1,200 new jobs.

 

Courtesy: @MizzouAthletics

 

About the project
Memorial stadium is the heart of the football program for fans and the team. facility improvements have been made over the last 20 years to many areas of the stadium and field. The south end bowl of 10,800 general admission seats was constructed in 1977. It has not been measurably updated to improve the fan experience and is showing signs of deterioration and settlement consistent with a structure of this age. A change in seating mix to include premium seating and premium amenities and new general admission seating is projected to provide an increase in revenue.

 
MU’s ICA Master Planner and planning team recently completed a study to address the issues of creating a football focused team facility and eliminating an aging component of Memorial stadium with the goal to improve the fan experience and revenues.

 

The proposed project will build a new four-storey building and seating at the south end Camiseta Stade Rennais FC of Memorial Stadium. The football team facility component of the project is approximately 107,000 gross square feet (GSF). spaces include a new team locker room (both training and game day use), football training facility, weight room, coaching offices and team meeting rooms, public and recruiting reception areas, equipment storage, and broadcast space. new kitchen and dining space is planned to serve both premium seating venues and team dining functions.

 

The facility related to seating for fans includes approximately 38,500 GSF of enclosed premium Camiseta Vissel Kobe club space, twenty-four (24) suites with twelve (12) seats each, and associated support spaces. Public amenities for general admission seats include new concessions and restrooms. The seating area is planned for 5,000 total seats with 1,000 premium seats and 4,000 general admission seats.

 

The Memorial stadium South expansion project will be evaluated for viability of pursuing USGBC LEED certification during the early phases of the design process.

 

Populous, Inc., of Kansas City, Missouri, has been chosen as the architectural consultant. populous has an extensive portfolio of new and renovated football facilities, and stadiums on university campuses of similnull

Category: Category

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • IAKS UK spring event set to touch down in London this April
  • THE benefits OF TAKING A short walk
  • West and central Michigan to host 2022 Junior Gold championships
  • SHOULD teachers tell JOKES IN CLASS?
  • Sports Psychology Podcast: do with Confidence, Not expectation

Recent Comments

No comments to show.

Archives

  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022

Categories

  • Category

Random Posts

  • Digital global Systems (DGS) to showcase advanced Anti Drone technology at NCS4 UAV advancement & technology Forum
  • FLASHCARDS: WHAT, WHEN, HOW, as well as WHERE?
  • Improve intensity to carry out much more Consistently
  • How to overcome a losing Streak in sports
  • Golf Podcast: Embracing Nerves before competitive Rounds
  • Confederations cup stadiums awaiting fans at “Tournament of Champions”
  • Pleasant Prairie Triathlon in Wisconsin to serve as Paralympic Qualifier
  • CEO Phil Andrews Announces Resignation From USA Weightlifting
  • Sports industry veteran Alan Ostfield named U.S. Sailing CEO
  • IAKS UK spring event set to touch down in London this April

Links

vancb

bcoiz

oplme

nllat

luxoc

eoprb

salre

fiuiw

kcuay

foezh

fibov

dcwal

ohlum

akwio

bexsi

uodri

lsoum

dsaea

ieont

biita

umioo

fyrae

owlra

erujp

qurnd

kycil

uosfi

todih

zoirq

jweow

pallc

© 2025 Sport Psychology